Project Description

Cooling Tower Upgrade

  • Decommission and remove from service 2 x base building cooling towers rated at 3700kw
  • Supply and install 2 x new Baltimore Aircoil Stainless Steel cooling towers rated at 3370kw
  • Decommission and remove the existing tenants condenser water pumps
  • Supply and installation of condenser water pumps and reconfiguration of the exisiting pipework to
  • Modifications to the steel pipework system on the cooling towers to suit the new arrangement
  • Installation of variable speed drives to pumps and fan motors
  • Upgrade controls and electrical wiring to suit the new arrangements
  • Supply and installation of all high and low level galvanised steel access platform structures
  • Design and installation of rigging structures and building works.