Project Description

New Building Air Conditioning System Upgrade

Work completed by Separable Portion below

  • General Separable Portion 1a, 1b, 1c, 1d, 1e and 1f
  • Separable Portion 2a – Basement 1
  • Separable Portion 2b – Basement 2-4
  • Separable Portion 2c – Level 11 Plantroom, New BMS Core Infrastructure
  • Separable Portion 3 – Levels 1, 2, 3, 4, 7 & 8
  • Separable Portion 4 – Level 5 Partial Upgrade
  • Separable Portion 5 – Level 6
  • Separable Portion 6 – Level 9
  • Separable Portion 7 – Level 10
  • New Sandwich Smoke Exhaust System


Summary of equipment installed:

  • 24 x Cosair Air Handling Units
  • 2 x Smardt-PowerPax Chillers Model WA095
  • BKB Pumps – 2 x CHW, 2 x CW, 2 x SCW & 1 HW
  • 2 x Moorea E Condensing Boiler
  • Cosair Hot Water and Cooling Coils (AHU)
  • Aqua Snap Carrier Heat Pumps
  • Mitsubishi VRF
  • Temperzone PAC units
  • 75 x Holyoake Variable Air Volume
  • 43 x VLT HVAC VSD
  • Refill Unit and Buffer Tank
  • 13 x Fantech Fans ( Stair Pressurisation, Smoke Exhaust, Outside Air, Toilet, Pump Room, Kitchen Exhaust and General Air)
  • Complete BMCS